الفاضلة بين اهم البدائلالمستخدمة في اعادة اعمار المنازل الخاصة المتضررة في غزة ” العمار من خلال الجهات الممولة او الاعمار من قبل الشخص المتضرر” pdf
ملخص الدراسة: More than four years after the end of the 2008/2009 war on Gaza Strip, much of the destruction wrought upon the Gaza Strip is still not been repaired. Only 1,700 housing units were rebuilt out of 3,481 that were totally demolished during that war. As selecting the suitable approach in housing reconstruction depends […]
تقييم العطاءات الغير متوازنة في مشاريع البناء في قطاع غزة pdf
ملخص الدراسة: The construction sector is considered as the most important sectors in the Gaza Strip. The procurement stage including the process of analysis and evaluation of the bids considered as the most important stages in the project life cycle. The implementing company will be selected in this stage. The selection of the implementing company […]
تقدير تكلفة مشاريع المباني الانشائية في قطاع غزة باستخدام الشبكات العصبية الاصطناعية pdf
ملخص الدراسة: Early stage cost estimate plays a significant role in the success of any construction project. All parties involved in the construction of a project; owners, contractors, and donors are in need of reliable information about the cost in the early stages of the project, where very limited drawings and details are available during […]
العلاقة بين المقاولين الرئيسيين ومقاوليهم الفرعيين في قطاع غزة pdf
ملخص الدراسة: The construction industry is one of the main sectors of the Palestinian economy. The contracting companies carry out important construction projects in cooperation with subcontractors. The majority of works in construction projects (such as shuttering, building, plastering, painting, carpentry, and ironmongery works) are implemented by subcontractors through the main contractors[1]. This study aimed […]
اعداد نموذج لحساب التكلفة الطارئة في مشاريع الابنية في قطاع غزة باستخدام تحليل الانحدار المتعدد pdf
ملخص الدراسة: Construction projects in the Gaza Strip are facing many risks and uncertainties that lead to cost overrun. However, in practice, the contractors may be unable to make appropriate pricing allowances for risk. Estimating cost contingency allocation accurately in a bidding process is one of the key success factors of project risks management. However, […]
تحليل قطاع الانشاءات الغير رسمي ” المقاولين الغير مسجلين ” في قطاع غزة pdf
ملخص الدراسة: The Construction sector is one major component of the Palestinian economy with regard to its contribution in the income generation and employment. Contractors in this sector can be divided into two groups: Group one: Registered contractors in the Palestinian Contractor Union (PCU) represented by the contracting companies. Group two: Unregistered contractors as informal […]
إمكانية تطبيق نظام المخطط الأخير في المشاريع الإنشائية بقطاع غزة pdf
ملخص الدراسة: Lean construction is considered one of the newest research areas that are adopted in construction industry. It is defined as a continuous process of eliminating waste, increasing value, and meeting or exceeding customer requirements. Reducing the wastes in process, time and costs, and maximizing the value added are considered a crucial strategy to […]
اعداد نظام متعدد المعايير في ترسية العطاءات على مقاولي التشييد في قطاع غزة pdf
ملخص الدراسة: Selection of the best contractor to implement a project on time, within a reasonable price and with an acceptable level of quality is a key factor for the project success. Generally, contractor failure can only be seen after the contractor has failed to perform on the project. This research has been conducted through […]
ضغط العمل على المهنيين في المشروعات الانشائية في قطاع غزة pdf
ملخص الدراسة: Stress problems are intense in Gaza Strip in general and specially in the construction industry. Construction is a competitive, ever-changing, and challenging industry. Therefore, the majority of construction professionals suffer from stress. This study aims to explore the stressors, stress levels, performance, and coping behaviors relationship among construction professionals including project managers, architects, […]
العوامل المؤثرة على مشاركة المقاولين في المناقصات الانشائية pdf
ملخص الدراسة: The tendering stage plays a critical role to connect, specify, and attract suitable contractors in the clients’ projects. Throughout this stage, clients seek to obtain the ideal participation process which reflects qualified and suitable number of contractors and adequate level of competitiveness that attains the parties’ strategies and benefits. This research is conducted […]